The Levin Courthouse Capital Security project includes the addition of two new ramps on the existing sidewalk; two new security screen stations at the main entrances; and a new ADA lift to assist visitors who cannot use the stairs from the lower portion of the first floor to the main level. Work also includes a new enclosed vehicle sally port in the basement loading dock area. A new CMU enclosure with roll-up doors will be installed within the existing loading dock to provide a secure prisoner loading/unloading zone. Work will also include modifications to the existing elevator which will be upgraded to meet current USMS Publication 64 requirements for use as a secure prisoner elevator. Also included in the scope of work are two new prisoner holding cells and modifications to existing doors to allow for prisoner movement to and from the court rooms.