Accel renovated University of Illinois Chicago (UIC)’s 2,650 square-foot existing Chemistry Lab 3013 SELW to upgrade lab function. The project included replacement of the existing laboratory benches and sinks, installation of a new epoxy floor, repainting of the walls and exposed ceiling, re-lamping and repainting the existing light fixtures, installation of new backpack and coat cubbies, and installation of new white marker boards.