CPS Leland was a two-year mechanical renovation, notably removing two old boilers, associated duct and piping and installing two new boilers with VFD’s. We also added a new 240-ton Air-Cooled Screw Chiller and converted the building to all dual temp piping for the 30+ new UV’s. A new transformer for the chiller was required which was not in the original scope. A new generator was also installed, four new air-handling units, fans, VFD’s, REF and EF units throughout, upgraded electrical panels and lighting throughout, new classroom millwork, new plumbing, and fixtures in the bathrooms, and much more.

PROJECT TYPE

Design-Bid-Build

OWNER

Chicago Public Schools

LOCATION

Chicago, IL

CONTRACT VALUE

$11.81M