UIC COMRB – 8th Floor Research Lab Remodel

Oct 1, 2021

Accel updated the existing MEP infrastructure of the 8th floor Research Laboratory in order to support the new Biosafety Level 3 laboratory (BSL-3/ABSL-3). The work is part of an overall plan to improve the Biosafety Laboratory research facilities available within the College of Medicine.

Work included new walls, doors, hardware, architectural finishes, casework, mechanical, electrical, plumbing, building automation, roofing, and fire protection infrastructure. The roofing scope of work included installing new structural steel framing, demolishing and patching the existing roofing for the new rooftop exhaust fan.

PROJECT TYPE

Design-Bid-Build

OWNER

University of Illinois

LOCATION

909 South Wolcott Ave, Chicago, IL

CONTRACT VALUE

$440K